Wednesday, January 22, 2014

Week 7

Kenneth & myself mainly started on building the beds for the Cambridge dorms while Wind & Shawn had to work on composting and perfecting the Christmasing Video.



In that week, we also helped Phil to put up the kabuki drop. Basically, it looks nicer when the curtains drops when the puppetry performance starts and also to remove the curtains easily when the performance is over. 
We faced some problems while we were trying to put up the kabuki drop, even after drilling the drop into the panels, we realized that the kabuki drop doesn't seem to be able to hold. 

We went to check and realized that we needed to cut more wood and drill them from the top as there were no hard wood supporting the drop for certain sections.
On Friday, we had our reshoot for one scene of the Christmasing video as Joshua felt that Jason looked too tired in the original shots.
We also continued to helped Phil with wiring the cabuki drop.

On Saturday, Phil & Kent brought us out for Japanese lunch. And they drop us off at Sacremento to walk around before our Mandarin Christmasing at night. 

I did camera for the night.

On Sunday, I did camera for both service and our first preschool christmasing performances.


After service, we had a mass media training on how to setup the intercom system for Christmasing, so that we will be more efficient on that day itself.(:

No comments:

Post a Comment