Kenneth & myself mainly started on building the
beds for the Cambridge dorms while Wind & Shawn had to work on composting
and perfecting the Christmasing Video.
In that week, we also helped Phil to put up the kabuki drop.
Basically, it looks nicer when the curtains drops when the puppetry performance starts and also
to remove the curtains easily when the performance is over.
We faced some
problems while we were trying to put up the kabuki drop, even after drilling
the drop into the panels, we realized that the kabuki drop doesn't seem to be
able to hold.
We went to check and realized that we needed to cut more wood and
drill them from the top as there were no hard wood supporting the drop for
certain sections.
On Friday, we had our reshoot for one scene of the
Christmasing video as Joshua felt that Jason looked too tired in the original
shots.
We also continued to helped Phil with wiring the cabuki
drop.
On Saturday, Phil & Kent brought us out for Japanese
lunch. And they drop us off at Sacremento to walk around before our Mandarin
Christmasing at night.
I did camera for the night.
On Sunday, I did camera for both service and our first
preschool christmasing performances.
After service, we had a mass media training on how to setup the intercom system for Christmasing, so that we will be more efficient on that day itself.(:
No comments:
Post a Comment